Sr. SAP BASIS CONSULTANT

Hyderabad, Andhra Pradesh, INDIA

Apply

                        

Fareed Ahmed                                                    fareedcool26@gmail.com

SAP- Basis Consultant                                              Mobile: +91- 9959893758 

 

Professional Summary

  • SAP Certified Technology Associate.
  • SAP A-1 Solutions Certified Associate.
  • SAP Basis consultant with an overall IT experience of more than 11 yrs which includes 5+ years of SAP Product Life Cycle management (Consulting, Implementation, Basis administration and SAP Technical Enhancement package Upgrades).
  • Presently Working with YASH-TECHNOLOGIES since Mar-03-2008 – to- till date
  • Involved in  3 end-to-end implementation and 2 Support projects
  • SAP Certified Business All-in-One Associate.
  • Conceptual Knowledge of SAP Roadmap on SAP HANA / SAPTDMS / SAP Project Gateway.
  • Experience in Installation, Configuration and Production support of SAP R/3 4.7 Enterprise and ECC 5.0/6.0 on platforms like Win 2000/2003 /2008 Server and Linux6.0 Red Hat Servers.
  • Installation, technical administration and monitoring of the SAP Net weaver Products like EP 6.0/7.0
  • Expert in SAP Service Connections, Applying support packages, Add-on components, Kernel Upgrades and Enhancement Packages (Ehp1, EHP3 and Ehp4).
  • Expert in Backup and Restore of Databases Like (Oracle System copy usingOraBrcopy,MS-SQL and DB6
  • Worked on setting up Solution Manager 7 EHP1 for Solution Monitoring, Generating Product Keys, and Maintenance Optimizer for Entire Landscape.
  • Worked on Client Administration like Client copy, Client Export/Import, Remote Client Copy and Assigning Logical System to Client.
  • Worked on Transport Management System (TMS) Complete setup of Correction & Transport System (CTS) using STMS. Importing TPs through STMS, creation of transport routes and monitoring TPs, trouble shooting TP import problems.
  • Involved with applying OSS notes using SNOTE, Support Packs, and ADD-ON using SPAM AND SAINT.
  • Experienced in Database Backup/Restore, Monitoring,
  • Proficient in the areas of installation, user administration, client administration, kernels upgrade and transport management system.
  • Worked on SAP PI 7.0 & Pi 7.3and having good knowledge on components like NWA and SLD.
  • Proficient in network administration
  • Experienced in Oracle and DB2 Database administration including database maintenance & performance tuning.
  • Worked on NWBC 3.0, TREX.
  •  Worked on Various Dumps Issues.

Technical Summary

 

SAP Releases

4.7EE,ECC5.0,ECC6.0 SAP ECC 5.0, SAP ECC 6.0

Solution Manager 7.0 EHP1, EP 7.0

SAP NetWeaver 04/04s

Technical Skills

 Oracle 9i, 10g, MS-SQL 2000 & 2005,DB6 09.01.0008

 

 

Operating System

Windows 2003 server, windows 2008serverR2, Solaris 10 Part1,Linux red Hat 6.0,6.1, Suse Linux Enterprise 11

Hardware

HP DL 380  server, HP DL 585 server,HP DL 360, IBM Server xSeries 260

 Dell Power Edge Server, HP ProLiant DL180 G6.

Virtualization Technology

Vmwareesxi3.5,4.1CloudComputingAMAZONE EC2,VSphere4.0

 

 

Education:

 

  • MBA Systems
  • B.Com

 

 

Other Certifications

           

  • Microsoft Certified System Engineer

 

 

SAP Professional Experience:

 

Current Project: -                              from 21st -May-2012 to Till Date

 

Client Name

SEQUEL-LOGISTCIS

Project Name

IMPLEMENTATION & SUPPORT

Role

Sr.BASIS CONSULTANT

SAP Environment

EHP5 for SAP ERP6.0 ABAP stack, On Windows with MS-SQL2008, SAP NetWeaver 7.3,Solution Manager 7.0 EHP1, SAP router

 

 

 

 

 

EHP5 for SAP ERP 6.0 System Landscape

----------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool 
  • Installation of IDES SAP ERP6.0 EHP4 System                  
  • Built DEVELOPMENT and TESTING Systems EHP5for SAP ERP6.0 System
  • Installed SAP ECC 6.0 on MS-SQL 2008 R2
  • Performed Post-Installation activities
  • Performed system copies
  • Performed Database backup using Management Studio MS-SQL 2008 R2
  • Performed Client copies
  • Performed User Administration

 

SAP NETWEAVER 7.3 PI7.3 System landscape

--------------------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool
  • Installed Development and Quality System on MSSQLSRVR 2008 R2
  • Performed Post-Installation Steps
  • Performed Client Administration
  • Performed User Administration
  • Designing Integration Content
  • Performed SLD configuration
  • Create Product
  • Creating Software components
  • Creating Technical system
  • Creating Business System
  • Performed system copies
  • Performed Database Backup using Management Studio MS-SQL 2008 R2

 

  SAP Solution Manager:

---------------------------------------------------------------------------------

  • Built SAP Solution Manager EHP1 on MSSQLSRVR 2008 R2
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alert

 

SAPROUTER

 

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router with SNC
  • Maintaining saprouttab entries for all the said servers in the landscape
  • Maintained Saprouttab File
  • Allowing SAP to access Clients Production systems.

 

 

 

Project5                                from 18-July-2011to 10-May-2011

 

 

Client Name

GLOBAL ENERGY Pvt Ltd

Project Name

IMPLEMENTATION & SUPPORT

Role

Sr.BASIS CONSULTANT

SAP Environment

EHP5 for SAP ERP6.0 ABAP stack, SAPNetweaver7.3 PI7.3, Solution Manager 7.0 EHP1, SAP router and Content Server 640.

 

 

SAP ECC 6.0 System Landscape:

----------------------------------------------------

Designed Hardware Seizing Using Quick Seizer tool 

Installation of IDES SAP ERP6.0 EHP4 System                  

Built DEVELOPMENT and TESTING Systems EHP5for SAP ERP6.0 System

Installed SAP ECC 6.0 on MS-SQL 2008 R2

Performed Post-Installation activities

Performed system copies

Performed Database backup using Management Studio MS-SQL 2008 R2

Performed Client copies

Performed User Administration

 

 

SAP NETWEAVER 7.3 PI7.3 System landscape

--------------------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool
  • Installed Development and Quality System on MSSQLSRVR 2008 R2
  • Performed Post-Installation Steps
  • Performed Client Administration
  • Performed User Administration
  • Designing Integration Content
  • Performed SLD configuration
  • Create Product
  • Creating Software components
  • Creating Technical system
  • Creating Business System
  • Performed system copies
  • Performed Database Backup using Management Studio MS-SQL 2008 R2

 

  SAP Solution Manager:

---------------------------------------------------------------------------------

  • Built SAP Solution Manager EHP1 on MSSQLSRVR 2008 R2
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alert

 

 

 SAP Content Server 640 Only Singal System

  • Installed Content Server 640 with MaxDB 7.8/IIS 7.5 on Win-2008 R2
  • Performed Post-Steps
  • Create Content Repository
  • Integrated R/3 System with Content Server

  

                                                    

SAPROUTER

 

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router with SNC
  • Maintaining saprouttab entries for all the said servers in the landscape
  • Maintained Saprouttab File
  • Allowing SAP to access Clients Production systems.

Project 4         from 11-SEP-2009- To 10-Jul -2011

 

Client Name

VASCULAR COCEPTS,LINCOL HELIOUS,RELIABLE,SHAKTI METDOR,HCL,INNOVA,VINERGY,ARSHIA,TRANSPHOME

KALYANI STEELS

Project Name

AMS

Role

BASIS CONSULTANT

SAP Environment

EHP5FORSAPERP6.0ECC6.0dualstack,SolutionManager7.0 EHP1,BI,BOBJ-edge3.0

 

Contributions:

 

  • Monitoring PRD systems.
  • BACKUP/RESTORE
  • Approving SP downloads using solution Manager
  • Generating EWA-Report of PRD systems using Solution manager
  • Performing Client Administration
  • Downloading, Configuring and applying OSS Notes
  • Assigning Necessary Authorizations to users.
  • Generating access keys for Objects and Developers.
  • coordinating with technical-Consultant at Client Site
  • Kernel Upgrade
  • Performed Backups using management Utility in MS-SQL 2005
  • Applying Support Packs on Dual stack using JSPM
  • Performing On Line and Off Line Backup
  • Transporting Request From QAS to PRD
  • User Administration
  • Creating Authorizations Object using T-code su21
  • Managing Spool Requests using SP01
  • Utilized SU53, System traces and debug utilities to optimize authorization checks.
  • User creation/deletion/locking/unlocking
  • Maintained Roles
  • System Copy
  • Installation of VPN-Client,CyberoamVPNClient-IPSEC
  • Installed Aqua-Data Studio 6.0 for Database Monitoring.

Applying SAPGUI patches

  • Designed  Hardware sizing for SAP ERP 6.0 Landscape
  • Installation of Linux Red HatEnterprise6.1
  • Performed All OS level activities required for installation of EHP5 FOR SAP ERP 6.0
  • Build Development System and Quality
  • Designed Backup strategy and I/O Device Strategy
  • Designed Client Strategy
  • Designed Security Role Matrix along with Functional Team
  • Worked with process experts on Segregation of Duties (SOD) issues
  • Implement standards for custom authorization objects and created it.
  • Performed Post-Installation of  SAP ERP 6.0
  • SPOC for I/O in SAP Implementation
  • Generating Developer Key’s for Developer User’s
  • Registering Objects
  • Applying Notes

 

 

Project 3                                                                    from 11-NOV-2008- To   28-AUG-2009

 

Client Name

GCS-USA

Project Name

A1 Chemical Product Certification, Implementation and Support

Role

SAP BASIS CONSULTANT

SAP Environment

VMwareesxi3.0, Bare Metal Linux-Interface.

SAPERP6.0,ECC6.0,SAPAll-in-OneSolutions,PI7.1,SolutionManager EHp1

 

Brief Description of Project

 

GCS is a Certified Channel Partner of SAPAmericain the Northeast. For over ten years, YashUS, a full service provider, has been an SAP Certified Channel Partner selling, supporting and servicing SAP products. Now certified by SAP for industry vertical solutions including, SAP Business All-in-One solutions developed by Yash US. Industry Vertical Solutions feature fixed price and accelerated installations to lower cost and speed time to ROI while meeting industry specific requirements 

 

Contributions:

 

  • Creating VMware Instance on VMware ESXi3.0 Using VMware Infrastructure Client 2.0
  • Accessing Physical VMware ESXi 3.0 Server Using ILO-HP Technology.
  • Increased RAM of Running Virtual Instance.
  • Increased Hard disk Space of Running Virtual Instance
  • Interacting with On-Site coordinating with technical-Consultant at Client Site
  • Worked on Tools shipped with VMware Server
  • Connecting Remotely to Virtual Machines
  • Logging VMware Server Events on Windows
  • Installation of Operating System (Win-2003 SR2)
  • Installation of Database MS SQL Server 2005
  • Installation of SAP ERP 6.0
  • Perform Post installation Steps
  • Upgrading to EHP-3 for ECC6.0 with SP03
  • Installation of BP-ERP05  and BP-INSTASS add-ons
  • Performed Technical Prerequisites as per Quick Guide for ChemOne
  • Uploading Scope File and Data Files
  • Activation of solution using Building Blocks and eCATTs
  • Access ABAP+JAVA stack using NWBC 1.0
  • Applying Support packs using JSPM
  • Spam Upgrade
  • Upgrade JSPM Version.
  • Server Configuration activities of PI7.1
  • Applied both Reader Right and Interactive License for ADOBE
  • Performed BACKUP at Database Level using Management Planned Methode.
  • Kernel Upgrade of Dual Stack Using JSMP

 

SAP Solution Manager/Saprouter:

 

  • Built SAP Solution Manager EHP1 on MS SQL Server 2005
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alerts

 

Project 2                                             from   08-mar-2008 - TO   07-SEP-2008

 

Client Name

Colder

Project Name

Implementation

Role

Basis Administrator

SAP Environment

ECC6.0, CRM 5.0, Solution Manager 7.0,Mobile Client

 

Brief Description of Project:

 

Colder is a pipes Manufacturing industry. They have SAP ECC6.0 with MS SQL 2005 on Windows 2003 with database size of 200 GB.  It’s a 3 system landscape DEV and QAS on 2 different hosts, PRD Central System on separate host and with 2 Application servers on 2 different hosts.

Contributions:

 

Implementation Activities.

 

SAP Router:

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router
  • Maintaining saprouttab entries for all the servers in the landscape

SAP Solution Manager:

 

  • Built SAP Solution Manager 7.0  on MS SQL Server 2005
  • Performed Post-Installation steps
  • Configured Maintenance Optimizer
  • Configured Early Watch Alerts

 

SAP ECC 6.0 System Landscape:

 

  • Built Three System Landscape(DEV ,QAS and PRD)
  • Installed SAP ECC 6.0 on MS SQL Server 2005
  • Performed Post-Installation Steps
  • Scheduled Standard SAP Background Jobs
  • Configured parameters related to Zero Memory Management
  • Configured Transport Management System
  • Applied Latest Support Packages

 

SAP CRM 5.0 System Landscape:

  • Built Three System Landscape (DEV, QAS and PRD)
  •  Performed Post-Installation Steps
  •  ConfiguredMobileClient on CRM 5.0
  • Installation ofMobileClient

 

 

 

 

APPS-MODE-TECHNOLOGIES Pvt Ltd.

Project 1                                             FROM 06 -NOV-2006 - TO   15-FEB-2008

 

Client Name

Atrion

Project Name

Support

Role

SAP Basis Consultant.

SAP Environment

SAP 4.7 EE  (DEV,QAS& PRD)

 

 

Contributions:

 

  • Troubleshooting issues encountered while running t-code (st22)
  • Installation of SQL Server 2000 and SQL Server 2005 and applying service packs.
  • Installation of SAPGUI.
  • Setting up clients in all systems according to the Business requirements and performing client copy.
  • System Refresh.
  • Applying SAP Licenses for (ABAP)
  • Setting up the Transport Management System.
  • Configuring SNOTE for all servers.
  • Configuring Standard background jobs.
  • Upgrading SPAM version.
  • Applying support packages through SPAM.
  • Applying Add-ons thru SAINT.
  • Kernel Upgrade.
  • Installation of (Hebrew) Language.
  • Monitoring of SAP Systems

 

 

  • Worked as Network Administrator for Proman Gulf – OMAN, from June2005- Jan 2006.
  • Worked as system Administrator for Questivity, Hyderabad INDIA from Jan-2001 to Jan 2005.

 

 

CONTACT DETAILS:-

 

Address: 13-5-790/A/84/3

                  Mustaidpura Karwan-500006

                  HyderabadAndhra Pradesh

                 INDIA.

Phone:     +91-9959893758

Email:      fareedcool26@gmail.com

                        

Fareed Ahmed                                                    fareedcool26@gmail.com

SAP- Basis Consultant                                              Mobile: +91- 9959893758 

 

Professional Summary

  • SAP Certified Technology Associate.
  • SAP A-1 Solutions Certified Associate.
  • SAP Basis consultant with an overall IT experience of more than 11 yrs which includes 5+ years of SAP Product Life Cycle management (Consulting, Implementation, Basis administration and SAP Technical Enhancement package Upgrades).
  • Presently Working with YASH-TECHNOLOGIES since Mar-03-2008 – to- till date
  • Involved in  3 end-to-end implementation and 2 Support projects
  • SAP Certified Business All-in-One Associate.
  • Conceptual Knowledge of SAP Roadmap on SAP HANA / SAPTDMS / SAP Project Gateway.
  • Experience in Installation, Configuration and Production support of SAP R/3 4.7 Enterprise and ECC 5.0/6.0 on platforms like Win 2000/2003 /2008 Server and Linux6.0 Red Hat Servers.
  • Installation, technical administration and monitoring of the SAP Net weaver Products like EP 6.0/7.0
  • Expert in SAP Service Connections, Applying support packages, Add-on components, Kernel Upgrades and Enhancement Packages (Ehp1, EHP3 and Ehp4).
  • Expert in Backup and Restore of Databases Like (Oracle System copy usingOraBrcopy,MS-SQL and DB6
  • Worked on setting up Solution Manager 7 EHP1 for Solution Monitoring, Generating Product Keys, and Maintenance Optimizer for Entire Landscape.
  • Worked on Client Administration like Client copy, Client Export/Import, Remote Client Copy and Assigning Logical System to Client.
  • Worked on Transport Management System (TMS) Complete setup of Correction & Transport System (CTS) using STMS. Importing TPs through STMS, creation of transport routes and monitoring TPs, trouble shooting TP import problems.
  • Involved with applying OSS notes using SNOTE, Support Packs, and ADD-ON using SPAM AND SAINT.
  • Experienced in Database Backup/Restore, Monitoring,
  • Proficient in the areas of installation, user administration, client administration, kernels upgrade and transport management system.
  • Worked on SAP PI 7.0 & Pi 7.3and having good knowledge on components like NWA and SLD.
  • Proficient in network administration
  • Experienced in Oracle and DB2 Database administration including database maintenance & performance tuning.
  • Worked on NWBC 3.0, TREX.
  •  Worked on Various Dumps Issues.

Technical Summary

 

SAP Releases

4.7EE,ECC5.0,ECC6.0 SAP ECC 5.0, SAP ECC 6.0

Solution Manager 7.0 EHP1, EP 7.0

SAP NetWeaver 04/04s

Technical Skills

 Oracle 9i, 10g, MS-SQL 2000 & 2005,DB6 09.01.0008

 

 

Operating System

Windows 2003 server, windows 2008serverR2, Solaris 10 Part1,Linux red Hat 6.0,6.1, Suse Linux Enterprise 11

Hardware

HP DL 380  server, HP DL 585 server,HP DL 360, IBM Server xSeries 260

 Dell Power Edge Server, HP ProLiant DL180 G6.

Virtualization Technology

Vmwareesxi3.5,4.1CloudComputingAMAZONE EC2,VSphere4.0

 

 

Education:

 

  • MBA Systems
  • B.Com

 

 

Other Certifications

           

  • Microsoft Certified System Engineer

 

 

SAP Professional Experience:

 

Current Project: -                              from 21st -May-2012 to Till Date

 

Client Name

SEQUEL-LOGISTCIS

Project Name

IMPLEMENTATION & SUPPORT

Role

Sr.BASIS CONSULTANT

SAP Environment

EHP5 for SAP ERP6.0 ABAP stack, On Windows with MS-SQL2008, SAP NetWeaver 7.3,Solution Manager 7.0 EHP1, SAP router

 

 

 

 

 

EHP5 for SAP ERP 6.0 System Landscape

----------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool 
  • Installation of IDES SAP ERP6.0 EHP4 System                  
  • Built DEVELOPMENT and TESTING Systems EHP5for SAP ERP6.0 System
  • Installed SAP ECC 6.0 on MS-SQL 2008 R2
  • Performed Post-Installation activities
  • Performed system copies
  • Performed Database backup using Management Studio MS-SQL 2008 R2
  • Performed Client copies
  • Performed User Administration

 

SAP NETWEAVER 7.3 PI7.3 System landscape

--------------------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool
  • Installed Development and Quality System on MSSQLSRVR 2008 R2
  • Performed Post-Installation Steps
  • Performed Client Administration
  • Performed User Administration
  • Designing Integration Content
  • Performed SLD configuration
  • Create Product
  • Creating Software components
  • Creating Technical system
  • Creating Business System
  • Performed system copies
  • Performed Database Backup using Management Studio MS-SQL 2008 R2

 

  SAP Solution Manager:

---------------------------------------------------------------------------------

  • Built SAP Solution Manager EHP1 on MSSQLSRVR 2008 R2
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alert

 

SAPROUTER

 

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router with SNC
  • Maintaining saprouttab entries for all the said servers in the landscape
  • Maintained Saprouttab File
  • Allowing SAP to access Clients Production systems.

 

 

 

Project5                                from 18-July-2011to 10-May-2011

 

 

Client Name

GLOBAL ENERGY Pvt Ltd

Project Name

IMPLEMENTATION & SUPPORT

Role

Sr.BASIS CONSULTANT

SAP Environment

EHP5 for SAP ERP6.0 ABAP stack, SAPNetweaver7.3 PI7.3, Solution Manager 7.0 EHP1, SAP router and Content Server 640.

 

 

SAP ECC 6.0 System Landscape:

----------------------------------------------------

Designed Hardware Seizing Using Quick Seizer tool 

Installation of IDES SAP ERP6.0 EHP4 System                  

Built DEVELOPMENT and TESTING Systems EHP5for SAP ERP6.0 System

Installed SAP ECC 6.0 on MS-SQL 2008 R2

Performed Post-Installation activities

Performed system copies

Performed Database backup using Management Studio MS-SQL 2008 R2

Performed Client copies

Performed User Administration

 

 

SAP NETWEAVER 7.3 PI7.3 System landscape

--------------------------------------------------------------------------------

  • Designed Hardware Seizing Using Quick Seizer tool
  • Installed Development and Quality System on MSSQLSRVR 2008 R2
  • Performed Post-Installation Steps
  • Performed Client Administration
  • Performed User Administration
  • Designing Integration Content
  • Performed SLD configuration
  • Create Product
  • Creating Software components
  • Creating Technical system
  • Creating Business System
  • Performed system copies
  • Performed Database Backup using Management Studio MS-SQL 2008 R2

 

  SAP Solution Manager:

---------------------------------------------------------------------------------

  • Built SAP Solution Manager EHP1 on MSSQLSRVR 2008 R2
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alert

 

 

 SAP Content Server 640 Only Singal System

  • Installed Content Server 640 with MaxDB 7.8/IIS 7.5 on Win-2008 R2
  • Performed Post-Steps
  • Create Content Repository
  • Integrated R/3 System with Content Server

  

                                                    

SAPROUTER

 

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router with SNC
  • Maintaining saprouttab entries for all the said servers in the landscape
  • Maintained Saprouttab File
  • Allowing SAP to access Clients Production systems.

Project 4         from 11-SEP-2009- To 10-Jul -2011

 

Client Name

VASCULAR COCEPTS,LINCOL HELIOUS,RELIABLE,SHAKTI METDOR,HCL,INNOVA,VINERGY,ARSHIA,TRANSPHOME

KALYANI STEELS

Project Name

AMS

Role

BASIS CONSULTANT

SAP Environment

EHP5FORSAPERP6.0ECC6.0dualstack,SolutionManager7.0 EHP1,BI,BOBJ-edge3.0

 

Contributions:

 

  • Monitoring PRD systems.
  • BACKUP/RESTORE
  • Approving SP downloads using solution Manager
  • Generating EWA-Report of PRD systems using Solution manager
  • Performing Client Administration
  • Downloading, Configuring and applying OSS Notes
  • Assigning Necessary Authorizations to users.
  • Generating access keys for Objects and Developers.
  • coordinating with technical-Consultant at Client Site
  • Kernel Upgrade
  • Performed Backups using management Utility in MS-SQL 2005
  • Applying Support Packs on Dual stack using JSPM
  • Performing On Line and Off Line Backup
  • Transporting Request From QAS to PRD
  • User Administration
  • Creating Authorizations Object using T-code su21
  • Managing Spool Requests using SP01
  • Utilized SU53, System traces and debug utilities to optimize authorization checks.
  • User creation/deletion/locking/unlocking
  • Maintained Roles
  • System Copy
  • Installation of VPN-Client,CyberoamVPNClient-IPSEC
  • Installed Aqua-Data Studio 6.0 for Database Monitoring.

Applying SAPGUI patches

  • Designed  Hardware sizing for SAP ERP 6.0 Landscape
  • Installation of Linux Red HatEnterprise6.1
  • Performed All OS level activities required for installation of EHP5 FOR SAP ERP 6.0
  • Build Development System and Quality
  • Designed Backup strategy and I/O Device Strategy
  • Designed Client Strategy
  • Designed Security Role Matrix along with Functional Team
  • Worked with process experts on Segregation of Duties (SOD) issues
  • Implement standards for custom authorization objects and created it.
  • Performed Post-Installation of  SAP ERP 6.0
  • SPOC for I/O in SAP Implementation
  • Generating Developer Key’s for Developer User’s
  • Registering Objects
  • Applying Notes

 

 

Project 3                                                                    from 11-NOV-2008- To   28-AUG-2009

 

Client Name

GCS-USA

Project Name

A1 Chemical Product Certification, Implementation and Support

Role

SAP BASIS CONSULTANT

SAP Environment

VMwareesxi3.0, Bare Metal Linux-Interface.

SAPERP6.0,ECC6.0,SAPAll-in-OneSolutions,PI7.1,SolutionManager EHp1

 

Brief Description of Project

 

GCS is a Certified Channel Partner of SAPAmericain the Northeast. For over ten years, YashUS, a full service provider, has been an SAP Certified Channel Partner selling, supporting and servicing SAP products. Now certified by SAP for industry vertical solutions including, SAP Business All-in-One solutions developed by Yash US. Industry Vertical Solutions feature fixed price and accelerated installations to lower cost and speed time to ROI while meeting industry specific requirements 

 

Contributions:

 

  • Creating VMware Instance on VMware ESXi3.0 Using VMware Infrastructure Client 2.0
  • Accessing Physical VMware ESXi 3.0 Server Using ILO-HP Technology.
  • Increased RAM of Running Virtual Instance.
  • Increased Hard disk Space of Running Virtual Instance
  • Interacting with On-Site coordinating with technical-Consultant at Client Site
  • Worked on Tools shipped with VMware Server
  • Connecting Remotely to Virtual Machines
  • Logging VMware Server Events on Windows
  • Installation of Operating System (Win-2003 SR2)
  • Installation of Database MS SQL Server 2005
  • Installation of SAP ERP 6.0
  • Perform Post installation Steps
  • Upgrading to EHP-3 for ECC6.0 with SP03
  • Installation of BP-ERP05  and BP-INSTASS add-ons
  • Performed Technical Prerequisites as per Quick Guide for ChemOne
  • Uploading Scope File and Data Files
  • Activation of solution using Building Blocks and eCATTs
  • Access ABAP+JAVA stack using NWBC 1.0
  • Applying Support packs using JSPM
  • Spam Upgrade
  • Upgrade JSPM Version.
  • Server Configuration activities of PI7.1
  • Applied both Reader Right and Interactive License for ADOBE
  • Performed BACKUP at Database Level using Management Planned Methode.
  • Kernel Upgrade of Dual Stack Using JSMP

 

SAP Solution Manager/Saprouter:

 

  • Built SAP Solution Manager EHP1 on MS SQL Server 2005
  • Performed Post-Installation activities
  • Configured Maintenance Optimizer
  • Configured Early Watch Alerts

 

Project 2                                             from   08-mar-2008 - TO   07-SEP-2008

 

Client Name

Colder

Project Name

Implementation

Role

Basis Administrator

SAP Environment

ECC6.0, CRM 5.0, Solution Manager 7.0,Mobile Client

 

Brief Description of Project:

 

Colder is a pipes Manufacturing industry. They have SAP ECC6.0 with MS SQL 2005 on Windows 2003 with database size of 200 GB.  It’s a 3 system landscape DEV and QAS on 2 different hosts, PRD Central System on separate host and with 2 Application servers on 2 different hosts.

Contributions:

 

Implementation Activities.

 

SAP Router:

  • Registered SAP Router System at SAP
  • Installing and configuring Sap router
  • Maintaining saprouttab entries for all the servers in the landscape

SAP Solution Manager:

 

  • Built SAP Solution Manager 7.0  on MS SQL Server 2005
  • Performed Post-Installation steps
  • Configured Maintenance Optimizer
  • Configured Early Watch Alerts

 

SAP ECC 6.0 System Landscape:

 

  • Built Three System Landscape(DEV ,QAS and PRD)
  • Installed SAP ECC 6.0 on MS SQL Server 2005
  • Performed Post-Installation Steps
  • Scheduled Standard SAP Background Jobs
  • Configured parameters related to Zero Memory Management
  • Configured Transport Management System
  • Applied Latest Support Packages

 

SAP CRM 5.0 System Landscape:

  • Built Three System Landscape (DEV, QAS and PRD)
  •  Performed Post-Installation Steps
  •  ConfiguredMobileClient on CRM 5.0
  • Installation ofMobileClient

 

 

 

 

APPS-MODE-TECHNOLOGIES Pvt Ltd.

Project 1                                             FROM 06 -NOV-2006 - TO   15-FEB-2008

 

Client Name

Atrion

Project Name

Support

Role

SAP Basis Consultant.

SAP Environment

SAP 4.7 EE  (DEV,QAS& PRD)

 

 

Contributions:

 

  • Troubleshooting issues encountered while running t-code (st22)
  • Installation of SQL Server 2000 and SQL Server 2005 and applying service packs.
  • Installation of SAPGUI.
  • Setting up clients in all systems according to the Business requirements and performing client copy.
  • System Refresh.
  • Applying SAP Licenses for (ABAP)
  • Setting up the Transport Management System.
  • Configuring SNOTE for all servers.
  • Configuring Standard background jobs.
  • Upgrading SPAM version.
  • Applying support packages through SPAM.
  • Applying Add-ons thru SAINT.
  • Kernel Upgrade.
  • Installation of (Hebrew) Language.
  • Monitoring of SAP Systems

 

 

  • Worked as Network Administrator for Proman Gulf – OMAN, from June2005- Jan 2006.
  • Worked as system Administrator for Questivity, Hyderabad INDIA from Jan-2001 to Jan 2005.

 

 

CONTACT DETAILS:-

 

Address: 13-5-790/A/84/3

                  Mustaidpura Karwan-500006

                  HyderabadAndhra Pradesh

                 INDIA.

Phone:     +91-9959893758

Email:      fareedcool26@gmail.com